×

Case Study: Increasing Productivity in Zippers Manufacturing with Horus Platform

Project Overview:

Our client, a medium-sized zippers manufacturer, faced productivity challenges and downtime issues in their production process. Niotek proposed the implementation of the Horus platform to provide real-time data insights and predictive analytics for process optimization.

Challenges:

The client experienced lower productivity and efficiency due to challenges in tracking machine performance and monitoring the production process in real-time.

Solution:

Niotek conducted a comprehensive analysis, identified improvement areas, and implemented the Horus platform. The platform enabled real-time monitoring, identification of bottlenecks, machine downtime tracking, and overall equipment effectiveness (OEE) measurement.

Implementation Highlights:

  • Real-time Monitoring: Horus facilitated real-time monitoring of the production process.
  • Predictive Analytics: The platform's predictive analytics anticipated maintenance needs, preventing machine breakdowns and reducing downtime.
  • Efficiency Gains: After implementation, the client achieved a 40% increase in productivity and significantly improved overall efficiency.

Results:

The Horus platform empowered the client to optimize their manufacturing processes and achieve production targets. With a 40% increase in productivity and reduced downtime, the manufacturing process became streamlined and more efficient.

Conclusion:

The implementation of the Horus platform proved instrumental in helping the zippers manufacturer surpass productivity challenges. By providing real-time insights and predictive analytics, the platform enhanced efficiency, reduced downtime, and ultimately improved the client's bottom line.